SCHEDULE G (for Link House)
Installments Payable %
1. Immediately upon signing of this Agreement
10
2. Within twenty-one (21) working days after receipt by the Purchaser of the Vendor's written notice of the completion of:  
 
the foundation and footing works of the said Building
10
 
the reinforced concrete framework of the said Building

15

 
the walls of the said Building with door and window frames placed in position
10
 
the roofing, electrical wiring, plumbing (without fittings), gas piping (if any) and internal telephone trunking and cabling to the said Building
10
 
the internal and external plastering of the said Building
10
 
the sewerage works servings the said Building
5
 
the drain serving the said Building
5
 
the roads, drains and sewerage works serving the said Building
5
3. On the date the Purchaser takes vacant possession of the said Building, with water and electricity supply ready for connection. 12.5
4. Within twenty-one (21) working days after receipt by the Purchaser or the Purchaser's solicitors of the separate document of title to the said Lot together with a valid and registrable Memorandum of Transfer to the Purchaser duly executed by the Vendor or on the date the Purchaser takes vacant possession of the said Building, whichever is later.
2.5
5. On the date the Purchaser takes vacant possession of the said Building as in item (3) and to be held by the Vendor's solicitor as stakeholder for payment to the Vendor as follows:- 5
 
two point five per centum (2.5%) at the expiry of six (6) months after the date Purchaser takes vacant possession of the said Building;
 
 
two point five per centum (2.5%) at the expiry of eighteen (18) months after the date Purchaser takes vacant possessions of the said Building
 
  TOTAL 100%

 

SCHEDULE H (for sub-divided building (Strata) or Townvilla)

Installments Payable %
1. Immediately upon signing of this Agreement
10
2. Within twenty-one (21) working days after receipt by the Purchaser of the Vendor's written notice of the completion of:  
 
the work below ground level including piling and foundation of the said Building comprising the said Parcel
10
 
the reinforced concrete framework and floor slab of the said Building

15

 
the walls of the said Parcel with door and window frames placed in position
10
 
the roofing, electrical wiring, plumbing (without fittings), gas piping (if any) and internal telephone trunking and cabling to the said Building
10
 
the internal and external plastering of the said Building
10
 
the sewerage works servings the said Building
5
 
the drain serving the said Building
5
 
the roads, drains and sewerage works serving the said Building
5
3. On the date the Purchaser takes vacant possession of the said Parcel, with water and electricity supply ready for connection to the said Parcel
12.5
4. Within twenty-one (21) working days after receipt by the Purchaser of the written confirmation of the Vendor's submission to and acceptance by the Appropriate Authority of the application for subdivision of the said Building
2.5
5. On the date the Purchaser takes vacant possession of the said Parcel as in item (3) and to be held by the Vendor's solicitor as stakeholder for payment to the Vendor as follows:- 5
 
two point five per centum (2.5%) at the expiry of six (6) months after the date Purchaser takes vacant possession of the said Building;
 
 
two point five per centum (2.5%) at the expiry of eighteen (18) months after the date Purchaser takes vacant possessions of the said Building
 
  TOTAL 100%
 
 
 